Implications for Delivery

When putting together a contract for any service, clients must consider:

  • How road use – and therefore road risk – can be eliminated within the contract

  • What road use (if any) will still need to take place and therefore be managed to mitigate the risk.

  • What control measures will need to be in place:

    • vehicle safety specifications

    • driver safety specifications including selection and training

    • journey minimisation and management

    • performance management of the above.

Background

Nearly all contracts might include an element of road transport, even if it is only the contractor attending meetings with the client. As client you will need to specify the service you require (the what, how and when issues). Your specification will have significant influence not only on cost and service level, but also on the risks that will be generate by the contract. For example, meetings between client and contractor could be specified to be online only, eliminating travel.

Failure to recognise the importance of road risk management at the earliest stage of the contract process can have a significant effect on control of subsequent risks and may require considerable additional financial and managerial resource to rectify, as well as creating a legacy of potential liabilities for the client throughout the life of the contract.

When developing any specification, clients should avoid stifling innovation and improvement over the life of the contract, and set objectives which can become more stretching over time.

Existing arrangements should not necessarily be seen as 'given', but they provide a good place to start – factors such as the existing vehicle fleet may not be able to change at the outset of a contract, but provision can be made that as vehicles are replaced they meet a higher specification for example.

The client needs to specify and describe the principal features of, and the road safety performance standards for, the overall design of the service – road risk should where possible be eliminated by avoiding travel, and mitigated when it does have to take place.

What the Research Shows

According to the Ministry of Defence: “The two ways in which a Delivery Team can have the greatest influence in ensuring that the system design can achieve adequate safety performance throughout its life, are through:

  1. Setting appropriate safety requirements;

  2. Having effective Contract(s) with competent Contractor(s) for development and support.”

These facts are as relevant to the management of road risk as they are to any other health and safety risk within a contract.

Sources

Forestry England. (2014, May 6). Managing contracts: A supplementary guide. Version 1.0 – Final [PDF]. https://www.forestryengland.uk/sites/default/files/documents/ManagingContracts-Version1.0-6Mayl2014.pdf

International Association of Oil & Gas Producers [IOGP]. (2017). HSE management guidelines for working together in a contract environment (Report 423). https://www.iogp.org/bookstore/product/hse-management-guidelines-for-working-together-in-a-contract-environment/

Ministry of Defence. (2022, June 24). SMP 10: Safety requirements and contracts (ASEMS Document Version 4.4). https://www.asems.mod.uk/printpdf/guidance/posms/smp10

Swedish Transport Administration. (2019). Saving lives beyond 2020: The next steps – Recommendations of the Academic Expert Group for the 3rd Global Ministerial Conference on Road Safety. https://www.roadsafetysweden.com/contentassets/c65bb9192abb44d5b26b633e70e0be2c/200113_final-report-single.pdf


With thanks to The Transafe Network for their contribution to this content.